Electrical rough in and fit off for renovation start 17/12 finish b4 xmas

Daniel requested 1 quotes from Electricians in Coburg

  Rough in required week beginning Monday 17th Dec and finish before xmas. Fit offs mid/late feb.
-
- -Install TV antenna point and power point in family room
- -Install 1 ceiling light in family room
- -Move current ceiling light in family room so it is aligned with new light
- -Install 1 light switch to family room
- -Install power point for split system air con in family room (system to be installed at a later date)
- -Move light switch in kitchen
- -Change current fluroscent light to Kitchen to new light fitting
- -Install 1 downlight to Kitchen
- -Install 1 powerpoint to Kitchen splashback
- -Replace 3x existing powerpoint in kitchen
- -Install powerpoints for oven and rangehood
- -Install 2 downlights to Laundry (and light switch)
- -Install 1 powerpoint to laundry
- -Install 1 light switch in laundry for 3x external paraflood lights.
- -Install 2 downlights to Bathroom (and light switch)
- -Install 1 powerpoint to Bathroom
- -Install exhaust fan to bathroom
- -There are some exposed electrical cables running on the outside of the weather boards at the rear and side of the house (when previous owners built the extension). These will need to be either put in a conduit or ideally placed in the wall under the weather boards.
- -Clean up wiring in ceiling so insulation can be installed
-

Electricians that Responded

Cornford Electrics

Quote Details

  • Suburb Coburg, VIC 3058
  • Specialisation Electrical Renovations
  • Date Listed 30 Nov 2007 - 1:39 pm

Similar Quote Requests

UPDATE FUSE BOX
UPDATE FUSE BOX

Switchboard upgrade
Its an old ceramic switchboard and fuses keep popping and powerpoints getting...

Electrical work for renovations
-upgrade switchboard to include R.C.D.s -install split system air...

Weatherboard house requires 3 rooms rewiring
We have 3 rooms and a hall that require changing of all light switches and...