Anura requested 3 quotes from Electricians in Keysborough
We need qualified electrician supply and install following
1. External switchboard and connect the power from the main building (60m distance)
2. Connect 3 services from external switch board (Main Gate motor control system, External lamp post power & External power outlets)
More information will be provided at the onsite visit.
3.
Tucker Wired Electrical Solutions
Elecsmith electrical contracting
Riteway electrical
UPS to be hardwired into the power.Has to be done today.
UPS to be hardwired into the power.Has to be done today.
NEED A NEW RANGEHOOD INSTALLED
HAD A FIRE IN KITCHEN AND RANGE HOOD WAS MELTED. NEED TO HAVE A NEW ONE...
Install down lightts
install down lights
INSTALL A CEILING FAN
CEILING FAN