Natalie requested 3 quotes from Electricians in Brisbane
Install 8 new double GPO's and 8 dual data to 8 new workstations.
-
- Disconnect existing workstations and reconnect in new configuration so as 1 double GPO and 1 dual data to each position reusing existing data cables.
-
- Relocate existing full height rack to adjacent the existing wall mounted rack.
-
- Supply a 10 way power rail to new rack.
-
- Install a 15 amp GPO behind new rack.
-
- Relocate data and voice patch panels from wall rack to full height rack.
-
- Retest data outlets after relocation.
-
-
Next Generation Electrical and Data
Install a third phone point in the house
Financial planner
Jumper MDF to my unit. ISP has already hooked up exchange to MDF.
ISP is TPG. Just need someone to come into the MDF and connect Vertical A to...
Move internet point from downstairs to up stairs
We live in Aurora Tower and currently the internet connection has been placed...
Electrial and Data Network Installation
7 x double power points installed.
- 7 x new data ports, plus new phone...