Mark requested 2 quotes from Electricians in Upwey
Asbestos removal guys need power shut off early in the day at point where the overhead cable from the street enters the house (before fuse box). This is because they are working near the fuse box. At the end of the day come back and re-connect. Needs to be on Wed 02/05.
Upwey 3158
Trictronics Services
Luman Electrics
Get 4 lights installed (including 1 pendant).
1 pendant light plus 3 square ceiling flush lights to be installed. 3 inside...
Repair powerline to property
tree fallen on power line and the power lines have disconnted and need to be...
Several misc electrical jobs within house (powerpoints, lights, etc)
Require the following:
- connect light to switch
- move power point within...
Replacing heat element in my SAGI ELECTRIC OVEN Model # SAFFO-SS
One of the two healing elements in the top of the oven is not working and...