Chris requested 3 quotes from Electricians in Moggill
I have been informed by Ergon that an electrician must check/setup meter box for fitting of off-peak meter for hot water. Can I get this done please.
Speedy Electrical
JCK Electrical Contractors Pty Ltd
Fitting a timer switch to the hot water system in metre box
Supply and fit a 15amp timer to the hot water switch in metre box
Electrician needed to relocate power box/switchboard.
Electrician needed to relocate power box/switchboard.
Switchboard replacement
my current switchboard still contains ceramic fuses which blow several times...
Upgrade electrical switchboard to 3 Phase Power for new ducted aircondition
Need to upgrade switchboard to 3 phase etc to accomodate proposed new ducted...