Bobby requested 3 quotes from Electricians in Dandenong South
Installing 125 Amps and 40 Amps circuit breaker. Running 3 phase cable - 3 actives, 1 neutral and Earth -- this can be in 50 m 4 core or Single core, which ever is cheaper.
Cable run is approximately 30 Meters, Easy job - running on purling and drop on wall - no scissor lift required.
can tap power from Existing Merlin gerin Switchboard with little modification due to size of breaker (Board has enough space and power ) or can make a small sub board.
Easy Job - Max half a day job for sparky who does industrial work.