Naomi requested 3 quotes from Construction & Property Services Experts in South Yarra
Structural engineering for construction to convert a 1960s single story brick shell to 2 office spaces (ground and first floor) through the addition of first floor mezzanine. Structural engineering to be completed within 4 weeks.
Structural engineering
Need to get structural engineering and soil test done for a double storey...
Engineer - engineering drawings
I had engineering drawings done for 2 new townhouses that were obtained for...
Report on knock down of load bearing walls
Would like to knock down 2 load bearing wall (one includes a chimney) in a...
Structural engineer
require a structural engineer to look into my ceiling and see if i can have...