John requested 3 quotes from Concreters in Palm Beach
Topping an existing internal slab with two separate heights. One section requires 60mm of topping which will be 3400x6300 and the other requires 100mm topping which will be 3650x6300. Edge/Thickening beams will also be required which will be 3650x3500(wide)x450(deep). Fabric wire and reinforcement will be required also.
Brisbane Concrete Retainer Walls & Fencing Pty Ltd
Repair or replace grease trap lids. concrete with metal edge
have a complaint from cleaners of tank
Pour concrete slab for garden shed
We need a concrete slab made for our garden shed. Shed specs 4.5m x 2.3m....
Remove and replace concreting paving around pool
Access down outside steps. Remove cracked concrete between pool and and...
Taskforce job in Elanora, QLD 4221
Stamped concrete.