Marc requested 2 quotes from Concreters in Brighton
Approx 15 lineal meters of 400 x 600 strip footing dowelled and grouted to existing footing at three locations with vertical rebar for reinforced block walls. 9m2 of 80mm paving slab and 3m2 of 100mm concrete step and landing. Job it be in two stages with slabs to follow 1-2 weeks after footings. Footings will require hand digging but will most likely be dug by client
Blacrete Constructions Pty Ltd
All Safe Foundations
Foundation slab for house extension. Clear site with tight access
Concrete slab for house extension. Rear of property with limited access (1.1...
Remove guttering & leveled with concrete
We need some guttering around a garden island broken up and leveled with...
Concrete slab for residential dwelling 3 quotes required
All trades people please send an email address so that i may send you our...
Dig footing and concrete. apporoximatley 60 metres
escavate footings 900 deep and about 60 to 70 meeters for a cornerblock.also...