Peter requested 2 quotes from Concreters in North Narrabeen
Approx. 1 x 3.5t truck of spoil to remove with mini-excavator (1.00m wide easy access)
- auger 450mm diam holes x 700 deep x 13 off
- 25mpa to auger holes (fence posts supplied)
- 8m2 of 110mm slab on ground
- install precast channel drain (supplied) x 14m
- provide approx.35m of kwik kerb or similar
- optional extra for frp 200mm retaining walls -12m2