Nick Hajiantoni requested 3 quotes from Concreters in Mount Martha
Need to concrete cellar with has been dug out
CONCRETE BACK PATIO AREA.
CONCRETE BACK PATIO AREA.
New split level home of 50 squares requires concrete and footings
Approx 80 sq meters of concrete
footings to engineering drawings
Concrete slab for 3 units. Approx 40 square mts
Need concrete slab for 3 units. Approx 40 square mts
Concrete stumps for decking 6.6m x 5.6m depth 600mm
Need concrete stumps installed for decking 6.6m x 5.6m. inspection required...