Already a Service Central user? Log in here
Exisiting shed needs a floor poured. It is approx 2.4x2.4 metres.
Concreting: General Concreting
in Kensington Banks, VIC 3031
18 October 2010
shed has been build. Needs floor poured. Requires form work around the base as the shed sits high. I'd like a slope towards the door on the inside. 2.4x2.4 approximately.
Concrete pavers cut and removed
Concreting: Concrete Cutting
in Kensington Banks, VIC 3031
14 August 2007
Our backyard has two areas approximately 5 x 4 m each which have a border of concrete pavers and are then filled in with concrete pavers. We would like to cut the concrete grouting so that the...