Infill bathroom excavation prior to tiling

Garry requested 3 quotes from Concreters in Brunswick

  Plumber had to remove and replace sewage and waste pipes in bathroom. Need concrete infill prior to tiling. Approx 3500*500*500. Also need about 1.5 square metre of path replaced outside.

Concreters that Responded

H.M Concreting

Prompt in responding, site inspection and quoting, and then had the job completed within a couple of days. Friendly and efficient.

Quote Details

  • Suburb Brunswick, VIC 3056
  • Specialisation General Concreting
  • Date Listed 5 Mar 2014 - 12:00 pm

Similar Quote Requests

Concrete driveway and make concrete floor for garden shed
I need two areas of my backyard to be concreted. 1. 7sqm area for floor of...

Rectify concrete drainage issue and grind off small sections of paint
Area is a 55sqm concrete terrace attached to 1st floor apartment. Pooling of...

Replace concrete path
Remove and replace existing 1.6m x 2.2m concrete slab with new concrete front...

Small concrete pad for tank
1600 x 800 x 100 concrete pad for water tank, F62 mesh. Excavation already...