Foundation slab for house extension. Clear site with tight access

Ferouza requested 3 quotes from Concreters in Brighton

  Concrete slab for house extension. Rear of property with limited access (1.1 meter). Quote should include all material and labour. Concrete pump can be provided.

START TIME: end of May - beginning of June

Concreters that Responded

Peter Lucas Concreting

D Calvano Constructions Pty Ltd - DNC

Quote Details

  • Suburb Brighton, VIC 3186
  • Specialisation Foundations
  • Date Listed 19 May 2008 - 12:40 pm

Similar Quote Requests

Remove guttering & leveled with concrete
We need some guttering around a garden island broken up and leveled with...

Strip footing, paving slab and step landing
Approx 15 lineal meters of 400 x 600 strip footing dowelled and grouted to...

Concrete slab for residential dwelling 3 quotes required
All trades people please send an email address so that i may send you our...

Dig footing and concrete. apporoximatley 60 metres
escavate footings 900 deep and about 60 to 70 meeters for a cornerblock.also...