Paul requested 3 quotes from Concreters in Burnside
Site preparation for spa area. Concrete footing 4m x 0.5m depth approx 500mm needs breaking/removing. Two sections of concrete path need cutting to allow trench to be dug under. Concrete path thickness 100mm. Access to work area via 1.2m wide gate
CMB Drains
BSF Paving & Plumbing Pty Ltd
Remove and re-do my concrete path
I want to remove my current concrete path around the house and re do it...
Est. 2.5 m3 of concrete footpaths I would like removed from our backyard
Est. 2.5 m3 of concrete footpaths I would like removed from our backyard....
Removal of existing concrete and area cleaned.
Removal of concrete in back yard and area cleaned.
70 SQ METERS OF CONCRETE NEED REMOVING
70 SQ METERS OF CONCRETE NEED REMOVING