George requested 3 quotes from Concreters in Watsonia
Require approx 100sqm of 100mm thick concrete to be removed. Concrete must be saw cut and removed with bobcat. Require someone with tipper, bobcat and excavator. Require soil to be removed also to RL heights. Job must be completed within the next 2-3 days.
On Track Excavations (Vic)
NDF Excavations
Concrete cut and removed from site
24 sqm metres (6mx4m) of concrete (with reinforcement) removed from back yard...
Concrete slab above the door step need to be removed.
There is a concrete slab just above the door way, and we need this one to be...
Concrete removal. Shed size slab. easy access.
Someone to remove a slab of concrete where a shed used to be.
28 sqm concrete garage slab removed & 50 sqm soil with brick path leveled
7m x 4m garage slab to be broken up and taken away. Separate area featuring...