Cameron requested 3 quotes from Concreters in South Yarra
Approx 7.3 meters of hot mix required to repair exisiting footpath along fenceline. Council will require sawing or squaring up to make the repair even. Largest gap is 27cm, average gap is 10cm.
3 Bays of Footpath need to be dug up, removed and then relaid
The approx overall area of the 3 sections of Footpath is 4600mm long x 1450mm...
Replace concrete footpath and driveway 3m sections after tree removed
Following removal of a large tree at my property, i need a 3m section of...
Exposed aggregate concereting
exposed aggregate concereting
Concrete path 3m+1.8m
Concrete path beside house approx 6 sq metres