9-12 mtr concrete path

David requested 3 quotes from Concreters in East Brisbane

  approx 9 - 12 mts of concrete pathway laying with some minor ground preparation, pathway requires block work or formwork steps (2 x).

Quote Details

  • Suburb East Brisbane, QLD 4169
  • Specialisation General Concreting
  • Date Listed 5 Jan 2012 - 2:35 pm

Similar Quote Requests

Concrete driveway required 25 square metres
Annerley house requires 25 square metres driveway on flat block.

Supply place and finish concrete
I have 3 small concrete jobs. 1st job is approximate 2m x 2m x 100mm thick...

Concreting
approx 12 sq m - slight slope - under a deck. dirt at the moment

Concreting - 2 areas to be done.
I have 2 areas I would like to have concrete laid. One is under the house to...