Replace fascia trim and rotted ends of barge boards

Kurt requested 3 quotes from Carpenters in Mulgrave

  I have approximately 50-60 meters of quad that needs to be pre primed and fixed into position. All cuts to be primed and glued prior to nailing.
I also have approximately 5 meters of rotted barge boards which need replacing.
I have a gable roof at the front, scaffold will be erected for use.

Carpenters that Responded

Hammer & Spade-Biz closed

Campi Property Services Pty Ltd

Quote Details

  • Suburb Mulgrave, VIC 3170
  • Specialisation General Carpentry
  • Date Listed 17 Jun 2016 - 10:40 am

Similar Quote Requests

Replace 11 wooden steps and replace a wooden door
11 wooden steps require replacing in rear yard

Repair of laundry and toilet floors (water damage)
Water damage (slow leak over the years) to particle boards in toilet &...

Sliding door supply and install
we have a cavity of approx 2050h x 1630w and would like to get a sliding...

Fix out of 4 no single bedroom units
Fix out of 4 bedroom units