Daniel requested 3 quotes from Carpenters in Hawthorn East
two eave lining panels are partially detached, these need to be reattached, and the third panel checked so it doesn't detach as well. the eaves are at the top of a three level townhouse, either 7.5m above the first level balcony, or 10.5m above and 3m inwards from the adjacent lane.
Energetik Trade Services
Hire A Hubby
UEB Melbourne
Weatherboard replacement
The weatherboards around a large window need to be replaced. The job...
Install an external door frame and side door on a garage
Install a hardwood door frame and solid door on my garage. This is a...
Post holders need replacing
6 post holders need replacing currently holding up posts of decking.
Plus...
Installation of cavity door
We wish to install a cavity door into a plaster wall. The space use to be a...