Bernie requested 3 quotes from Carpenters in Caulfield South
To lay approx 110 m2 of bamboo timber lounge and groove flooring to a new concrete slab. by direct stick method.
- pre application of a membrane barrier to be applied to the surface prior to laying of the floor surface.
ACTION PAINTING & GUTTER CLEANING PTY LTD
Prolific Home Developments Pty Ltd
Urgent Finishing work needed on house extension.
IMMEDIATE builder need to finish some carpentry work on house extension....
Damaged floor board requiring replacement or repair. Tasmanian Oak.
Hole in floorboard. 91 inch long floor board containing hole before next...
Peaking floorboard fixed/flattened
foor board peaking, needs cutting and re-fixing
Replace floor boards with tassie oak boards, approx 10sqm
I would like the old pine floorboards in the hallway to be replaced with...