Modify roof line (2100x700) replace gutter and cover space

Brian requested 2 quotes from Carpenters in Mcdowall

  Remove gutter and facia and modify existing overhanging roof line (700W x 2100L) back towards house by removing extisting tiles and timber support. Replace facia and gutter. Enclose space between house and perola (now 1200W x 2100L) with weatherproof materials.

Quote Details

  • Suburb Mcdowall, QLD 4053
  • Specialisation Decking
  • Date Listed 23 Nov 2007 - 7:44 pm

Similar Quote Requests

Timber frame, approx 3.5x4m to extend cover over exist back deck
The deck on my queenslander is partially covered. i need a frame approx. 3.5m...

Replace existing timber deck floor
Pull up existing timber deck floor and replace with new timber. Approx....

Replace timber pool decking. current decking is approx 10ys old
remove old decking and replace with new ?timber decking

Need a timber gate built and inlatted on deck stairs
We need a custom timber gate built and installed on our deck to block off the...