Gary requested 3 quotes from Carpenters in Nunawading
Supply and fit cranked beam around 3.6m attach to the ceiling joist and double studs in the wall per engineer paper.and supply building permit.
Single story, 60s house with subfloor. Existing Internal wall only has half metre to remove.
Enjoy Building and Maintenance Services
Affix Commercial Plastering Pty Ltd
Replacing weatherboard and insulation installation
Installing insulation and replacing weatherboard. Need only quote for...
Replace timber awning window & general timber work repairs (weatherboards)
Have 1 X rotted timber window and several rotted weatherboards around my home...
Build a small fixed-pane window
We recently had an old in-wall air conditioner removed, leaving an...
The glass on either side of the front federation door, needs to be replaced by wood
The glass on either side of the front federation door, needs to be replaced...