Floorboards have lifted in places and need to be repaired

Nicola requested 2 quotes from Carpenters in Glebe

  there are 2 jobs required:
1. Over the last year our floor boards have started lifting in various places. We were told that we need the floorboards lifted, ventilation installed and then floorboards replaced. This is happening in our lounge room from the back doors to the kitchen which would measure about 8m long by 3m wide.
2. We also have 2 boards on the second storey that need replacing from previous pest damage. We have been given the all clear from a pest inspection.

Carpenters that Responded

Kakev Carpentry Pty Ltd

Roses To Rivets

Quote Details

  • Suburb Glebe, NSW 2037
  • Specialisation Floor Boards
  • Date Listed 5 Jan 2009 - 2:20 pm

Similar Quote Requests

Hard wood floor repair
A section of the floor needs sanding back and re-glossing. Its not a huge job...

Floorboards needs replacing.Repair floor joist ect..
Floorboards needs replacing.Repair floor joist ect.. - Approx 13 metres sq

Replace existing undercove balcony floor boards with new approx 2m x 2mts
I have a small 2m x 2m undercover balcony, the floor boards have rotted from...

Floorboards
Get floor boards in a 2 bedroom unit