Gareth requested 3 quotes from Carpenters in Eltham North
A deck is required in 2 parts. Part 1 is 9m x 1.2 and it would meet an area of required deck of3.6m x 3.6m.
A roof is required along the 9 x 1.2m
and the boards of an existing deck replaced to match the new deck. Stainless steel balustrading is also necessary.
Lcw Carpentry and Construction
LOCK BUILDING GROUP PTY LTD
Studio, needs replacement of exterior posts
Outside of the studio on our property we have several wooden posts under the...
PEGOLA BEAMS REPLACED, LASER LITE REPLACED & PAINT
PLS CALL
Replace timber railings and panels around decking
On elevated decking top rails, bottom rails, sides, top bottom and side...
Existing timber balcony needs replacing and extending-1st floor landing
existing timber balcony needs replacing and extending-1st floor landing