8 x 2.4 joists replaced wallplate replaced down side of small weatherboard

Richard requested 3 quotes from Carpenters in Coburg

  The wallplate holding the studs has been mostly demolished by borer, likewise the ends of 8 existing joists that go halfway across small long weatherboard. A friend and I could do the job but time a problem. I would be happy to take a day and be assistant (I'm handy) if that works.

Carpenters that Responded

Hire A Hubby

Webcap Maintenance & Construction Pty Ltd

Inner City Property Solutions

Quote Details

  • Suburb Coburg, VIC 3058
  • Specialisation Formwork
  • Date Listed 11 Jul 2011 - 12:33 pm

Similar Quote Requests

Shelves to be built for fireplace
carpentry work needs shelves built - for a fire place

Req to join 2 kitchen benches with a bench &install 2 shelves to the bench.2.5mW & 1.1mH
Construct shelving to attach to existing cupboards in the kitchen.Require to...

Req to join 2 kitchen benches with a bench &install 2 shelves to the bench.2.5mw & 1.1mh
Construct shelving to attach to existing cupboards in the kitchen.require to...

8 x 2.4 joists replaced wallplate replaced down side of small weatherboard
The wallplate holding the studs has been mostly demolished by borer, likewise...