Jack requested 3 quotes from Builders in Maribyrnong
Handrail installation to existing stairs required, preferably timber and metal brackets. The total length of the handrail required is approximately 5-6m.
Free onsite quotation required.
Install a wire cage over a water meter
build and install a wire cage over the water meter
Building a split level on a sloped block
Empty block with size of 12m by 26m. Fall is from street to back of 3m. Side...
Renovations to an outdoor patio and a fully enclosed dog run
I have a couple of outdoor living type jobs that I’d like to get a quote from...
Building general renovation work
I am looking at doing some renovations on an investment property in Braybrook...