Judy requested 3 quotes from Builders in Glenhaven
after having digger in we will need rear and side sleeper wall erected 1 meter high by approx 60 meters in total length, willl need ag pipe gravel back fill. Soil may need trimming back as digger is preparing slab only, but will get machine to dig as close as possible.There is a existing neighbours fence which has to stay on top.
Remove bathroom wall, redo timber, Re-skin wall, plus tile
Timber inside wall has termite damage, termites have been treated and no...
Roof covering for outdoor deck
exsitng deck requires roof covering approximate dimensions 10m x 3m. Should...
Open a wall window.
I like to opne a wall window in my north side, believe the wall is...
Renovation inside the house
We need a builder or handy man, we want to remove some walls, do a bit of an...