Renovation to ground floor of house: layout changes & tiling & bathroom

Julie requested 3 quotes from Builders in Castaways Beach

  Changing the layout of the ground floor of 15yo home. Originally a pole home with the lower ground made into accommodation afterwards. Job involves: reorganising layout by removing a few internal walls, inserting new internal walls, renovating bathroom entirely, changing two windows for sliding doors, quite a bit of cabinetry, additional lighting, relocating sink for a wet bar, adding awnings over windows and doors and replacing rotten wood on outside staircase. Plans and elevations for a building designer ready.

Quote Details

  • Suburb Castaways Beach, QLD 4567
  • Specialisation General Building Work
  • Date Listed 7 Oct 2015 - 3:10 pm

Similar Quote Requests

Concrete slab 20m x 10m and besser blocks 2.7m high with colorbond roof
Quotes to build a new home with concrete slab 20m x 10m and grey besser...

Bathroom renovtion
Remove the oversized bath. Remove the existing shower. Install double vanity...

Renovating 3 bathroom and kitchen
Im looking to renovate 3 bathrooms and kitchen to modern and repair

Concrete repair
Repair concrete trough under metal drainage grids across double gates entrance