Remove Non- loadbearing Concrete Walls in top floor unit.

Sean requested 2 quotes from Builders in Dee Why

  Job Requirements

1. Remove a portion of a non load bearing concrete wall and make good ceiling and wall.

2. Brick up and render over an existing door opening.

3. Cut a new doorway into an existing concrete wall.

4. Remove an old timber linen cupboard

5. All Rubish to be taken away from site.

All Walls are non load bearing and engineers drawings are available.

Quote Details

  • Suburb Dee Why, NSW 2099
  • Specialisation General Building Work
  • Date Listed 23 Aug 2009 - 5:04 pm

Similar Quote Requests

Extend family room and convert existing carport into a garage
we would like to extend our family room by about 2 or 3 metres (only one side...

Extend family room and convert existing carport into a garage
we would like to extend our family room by about 2 or 3 metres (only one side...

Repair/replace subsiding piers
Piers under house have sunk, possibly due to cracked pipe under bathroom.

Supply and install of bifold and related building works
Remove old windows, enlarge opening, install lintel, supply and install...