Internal Renovation

Leah requested 3 quotes from Builders in Ringwood North

  Remove load bearing wall between lounge room and kitchen (6m x 2.7m).
Resupport ceiling and roof area in lounge and kitchen by installing hanging beam to load bearing walls.
Remove smaller non-load bearing wall and door way adjacent to main wall. Repair Tasmanian Oak floorboards.
Build new wall - line up with existing hall way, lined with plaster board and skirting (2m x 2.7m) - Alter lounge room door way to suitable position due to hallway wall being extended.

Builders that Responded

Universal Building Solutions

Eco smart concept builders

Quote Details

  • Suburb Ringwood North, VIC 3134
  • Specialisation General Building Work
  • Date Listed 6 May 2013 - 1:27 pm

Similar Quote Requests

Unit complex needs new letterboxes (10 units)
Current letter box is wooden and on legs needs to be pulled down and new one...

Not sure but the concrete at the side of my unit which connects to my porch
The concrete near the side of my unit which connects to the porch has been...

Kitchen Bay window leaks between the frame and plaster wall
During moderate to heavy rains, the window leaks and cascades between the...

Build pergola 6 x 3 m2 area
Want to get 6 x 3 m pergola built on top of deck in my backyard. Need quotes...