Fill a doorway between two commercial suites

Owen requested 0 quotes from Builders in St Leonards

  Need to get a standard size doorway filled between two office suites. The job includes filling in the gyprock on both sides, completing the aluminum skirting and painting afterwards. The job is in St Leonards.

Quote Details

  • Suburb St Leonards, NSW 2065
  • Specialisation General Building Work
  • Date Listed 22 Nov 2010 - 3:05 pm

Similar Quote Requests

Carpentry work
Carpentry work to Floors, joists,doors, windows ect.

A laundry renovation
I would like to have built in cupboards and sink and open shelves on the top....

Building of pergola
small 5700 X 2100 aluminium with tinted pergola with yinted polycarbonate...

Balcony - installation of half spoon drain on tiled balcony
1) cut back and remove tiles down to concrete slab at balcony junction with...