Entire rebuild of outdoor toilet attached to unit.

Dean requested 3 quotes from Builders in Oak Park

  The toilet building was demolished to gain access to the main corner of the unit as it required underpinning.
The toilet structure needs to be rebuilt due to body corp requirements.
The rebuild will require excavation of the dislocated base slab underground.
Replacement of the base slab plus replacement of the concrete floor.
The toilet was constructed of double brick walls with a corrugated iron roof.
The east wall will require re toothing into the units rear wall.
a new toilet / hand basin /hot and cold taps and door will need to be replaced also.
electrical work is required for the internal and external light plus a power outlet.
The building is 1.5 wide x 2.7 long x 2.5 high mtrs approx .

Builders that Responded

AC Group

Haberfield Holdings Pty Ltd

Quote Details

  • Suburb Oak Park, VIC 3046
  • Specialisation Project Management
  • Date Listed 11 Dec 2011 - 1:21 pm

Similar Quote Requests

Existing terrace house, ext cracks in brk work,int walls,leak in storm water sys
Repair to leaking stormwater system repair to cracking in brickwork external...

Manager req to oversee Bathroom renovation
Project manager to work with our plumber (who has already roughed in the...

Project manager
Hi. I am looking for a project manager to oversee installing some new windows...

Project manager for a body corporate
Find a project manager for various things to be done at a property