BRAD requested 3 quotes from Builders in Mount Evelyn
planning permit granted. just waiting on planning permit, hopefully by end of next week. The job is in 3 parts. 1. The deck extension. 2. The main pergola over the decking. 3. The pergola out the back.
I am very keen for the decking extension to be completed by early Dec. The other 2 parts of the job can wait till new year if nec.
I can email draftsman drawings as well as engineering specs.
The roof of the pergolas to be made of colourbond steel.
Modcon Group
They were quick to respond to the job posting a week ago. Since then they have not contatced me at all about the job. I left a voice mail message on Wednseday [5 days after posting the job] for someone to contact me and yet no one has. Very poor follow up & customer service..
Build a garage/workshop
Garage/workshop to be built to match house. nothing existing. will require...
Quote for building garage at front of house
Three car garage quote for front house
Double carport - timber frame - tiled roof - dutch gable - approx 6m x 6m
double carport - timber frame - tiled roof - dutch gable - approx 6m x 6m....
We need a new garage and carport built. Steel.
We currently have an old carport that we want taken down and replaced with a...