Adam requested 3 quotes from Builders in Woodend
Need concrete slab (2.3m X 2.2m) for new spa together with work on existing deck to allow the spa to be sunk into the deck. Part of existing deck will need to be dismantled and some concrete stumps holding deck may need to be removed or relocated if in the way. Deck will then need to be reassembled once spa is in place.
I need a timber deck and timber and tin veranda built. I have approved plan
I need a timber deck and timber and tin veranda built. I have approved plans...
Old weatherboard shop .
- inspection to find any major problems
- quotation on repairs
New bathroom
Old bathroom taken out, new one buy and install
Build stud wall & door to close off room
Require a stud wall to close off a playroom. Length approx 4.8m, 9ft...