Tim requested 3 quotes from Builders in Marrickville
I need the following work done.
Remove a door and timber window in double brick, install lintel/beam? , remove pillar between the two, brick new sized opening and install supplied timber window. d/d/h.
Remove steel frame door and aluminium window side by side in single brick, resize opening, framing/studwork and install supplied bifold window.
Remove large aluminium window in single brick, cut and resize opening, framing/studwork, install supplied french doors and sidelights.
Render.
Required in about 4 weeks time.
Bathroom and deck
Possibly bring external laundry off patio and into internal bathroom. Redo...
Wall built in front of existing. Remove 700mm wall nearby-patch & make good
Existing gyprock wall to be built in front of existing one (i.e. brought...
Converting balcony into study/sun room with double glazed windows
Semi-enclosed Art deco brick balcony to be converted into internal space....
Second story addition on federation property
Period style renovations to a federation, double brick home. To include 1/2...