Greg requested 3 quotes from Builders in Prahran
A report from a registered building surveyor showing patron capacity calculations as outlined in the ‘Maximum patron capacity’ fact sheet.
A copy of the occupancy permit prescribing the patron capacity. If this permit cannot be supplied, then the report from the building surveyor must also include patron calculations on the same basis as per an occupancy permit under the Building Act 1993.
Pre-purchase building inspection for a two storey 4-BR dwelling in Armadale
We would like to organise for a a building inspection for a property we are...
Energy report to meet minimum requirement of BCA
Residential class 1 energy report to meet minimum requirement of the BCA
·...
Camera inspection of metal dacted heating ducting
inspect metal ducted heating ducting built into the concrete floor for the...
Building surveyor
pool fence to be constructed permit required