Building rectification

Christopher requested 3 quotes from Builders in Bridgeman Downs

  Remedial works to minimise any further Subsedence and to stablise the moisture conditions of the insitu soils addacent to the footings, improve drainage adjacent to footings with atleast 50 mm downward fall across the path a fall of at least 50 mm per metre away from the concrete path along with the front of the dewelling and repairs to the cracks at various places of the building.

Quote Details

  • Suburb Bridgeman Downs, QLD 4035
  • Specialisation General Building Work
  • Date Listed 18 Apr 2013 - 9:02 pm

Similar Quote Requests

Replace/Repair termite damaged timbers and certify
To whom it may concern, Our property at Albany Creek has suffered some...

BUILD A WALL APPROX 3.5M WIDE X 2.6M HIGH
I REQUIRE A WALL TO BE BUILT TO BREAK 1 ROOM INTO 2. ALSO A COVER FOR A POOL...

Bessa block outer fence
I have a bessa block fence to build at a new property in Aspley on the...

Modify and fitout 3 40' shipping containers to make a house
plan already done, need quotes to do modification in factory and transport...