Piers requested 3 quotes from Builders in Terrey Hills
Veranda roof to match existing, over existing deck.
2.4m(W)x 8m(L) approx.
Height off existing deck 2.5m measured from existing deck to underside of existing eave where it meets wall.
4 posts probably need to go to ground to replace exiting handrail posts. Height from ground to outside of veranda for each post is 3.7m, 3.6m, 3.6m, 3.3m.
Merbau posts (if not poss, steel posts ready to be merbau clad)
Merbau barge boards/fascia boards under gutter.
Colourbond roof and guttering.
Drainage to existing stormwater drain (under existing deck)
Sarking
Insulated for noise.
Shiplap lining to match existing, ready for painting
Provision for 2 downlights
Extend family room and convert existing carport into a garage
we would like to extend our family room by about 2 or 3 metres (only one side...
Extend family room and convert existing carport into a garage
we would like to extend our family room by about 2 or 3 metres (only one side...
Repair/replace subsiding piers
Piers under house have sunk, possibly due to cracked pipe under bathroom.
Supply and install of bifold and related building works
Remove old windows, enlarge opening, install lintel, supply and install...