Greg requested 3 quotes from Builders in Bardon
We are building an Ezy Home kit home, the style is a Moreton. Our land settles on the 30th of May. We want to start then. I was going to owner build, but have started a new job that makes that impossible. Please go to www.ezyhomes.com.au and look at the Moreton, I need someone who has experience with a similar kit home. Ezyhome says they can get the house to lock up in 9 weeks for $123000. The block of land is very narrow (10 m) and only 50 m long. The land is on a gentle slope so it will be a pole home on steel posts.
Hadore Pty Ltd
House build
complete build house and internal / external fixtures
drainage electrical,...
Two rafters & door frame have been chewed thru internally, need to be repaired
builder to repair termite damage, two rafters that have been chewed thru...
New Home constructed
new home build
the build is 9.5m high
Construction of new residence to lock up stage