Bathroom renovation, kitchen tiling, old wall tiled heater removed

Susan requested 3 quotes from Builders in Caulfield North

  Shower & tiles removed, New shower installed, bathroom floor & wall tiles removed & new tiles relayed, toilet walls (2) within bathroom demolished & walls repaired if wall removal damages wall, kitchen wall tiles removed, kitchen wall & floor tiles layed. In lounge room,old wall heater (include surrounding tiles removed) & gap replaced in wall.

Builders that Responded

Marsonia Interiors

RJG Projects

DPK Building Co

Quote Details

  • Suburb Caulfield North, VIC 3161
  • Specialisation General Building Work
  • Date Listed 24 Feb 2011 - 1:43 pm

Similar Quote Requests

Bathroom modification
Bathroom modification - needing to bath into walk in shower

URGENT QUOTE - 2 x Gallery walls (4.5m long and 3m long)
Two gallery (temporary/cheap) walls approximately 2500mm high. 1. 4500mm...

FILL IN DOORWAY, DEMOLISH WALL FIR NEW DIIR
1. FILL IN DOORWAY, REMOVE WALL BLOCKING HALLWAY, MAKE NEW DOORWAY AND...

Expand doorway to large openning, block in window
Open up doorway to larger gap, and block up large window to allow rendering...