Bathroom Demolition & Prep

Ben requested 3 quotes from Builders in Ripponlea

  Small bathroom 3x1.5m. Gut existing, remove tiles from walls and floor, expose subfloor for sewerage. Prep floor for re-tiling. Baton walls and hang boards for chasing plumbing. Hob bath, fit vanity and hang wall cabinet. Remove window and replace, cut window into higher position.

Builders that Responded

Universal Building Solutions

Thank you so much Gary, and thank you especially for all your hard work today, I feel very positive about the house for the first time in a while!

· over a year ago

UEB Melbourne

Scott Campbell Constructions

Quote Details

  • Suburb Ripponlea, VIC 3185
  • Specialisation General Building Work
  • Date Listed 9 Feb 2015 - 8:52 pm

Similar Quote Requests

Bathroom modification
Bathroom modification - needing to bath into walk in shower

URGENT QUOTE - 2 x Gallery walls (4.5m long and 3m long)
Two gallery (temporary/cheap) walls approximately 2500mm high. 1. 4500mm...

FILL IN DOORWAY, DEMOLISH WALL FIR NEW DIIR
1. FILL IN DOORWAY, REMOVE WALL BLOCKING HALLWAY, MAKE NEW DOORWAY AND...

Expand doorway to large openning, block in window
Open up doorway to larger gap, and block up large window to allow rendering...