Darrin and Rosemary requested 3 quotes from Builders in Gaythorne
Remove existing toilet from sleepout and install new bathtub and toilet in bathroom; Tile bathroom wall and section of floor; Reconfigure doorways and fill in old doorway with VJ boards; Frame and build wall in sleepout and bathroom; Remove cladding in sleepout and replace with VJ sheeting
H2H CONCEPTS
Hadore Pty Ltd
Restump house
Require re stumping of a few wooden stumps in our house
Need wall knocked out and room extended.
We need to extended 1 class room. There is two class rooms next to each other...
Building Alteration
Build rooms underneath existing house. No raising of house is required. Ready...
Building Alteration
Build rooms underneath existing house. No raising of house is required. Ready...