Andrea requested 3 quotes from Builders in Leopold
Need a ramp between 1:14 and 1:12 gradient with central landing to replace small landing with 2 steps at side of house. Approx 15 metres total length.
MKH Constructions
Small extension up stairs
up stairs is exsisting we want to turn a balcony into a closed room, that is...
Repair & replacement of external structural timberwork
Repair & replacement of external timberwork including external open and...
Sky Light to be built in
Need a about 6 foot x 5 foot sky light in ceiling roof truss to remain.
Urgently need someone to replace an eave made of hardie plank on a 2nd floo
Need someone to replace this eave, it is on a 2nd floor so a cherry picker is...