Mark requested 3 quotes from Brick Layers in Malvern East
a section of about 8 meters and two other sections approx. 4 meters which is a total of 12 meters . The mortar has eroded away and needs to be fill to stop further erosion, some section 3 courses and some 4 and some 2 course so it is not equal all the way around as expected, . it starts at in some case below ground level and some start above.
Caddy's Bricklaying
Demcon Australia
B & S Superior Bricklaying Pty Ltd
Repointing of a house wall
Brick layer
Possibly a damp course
But mainly repointing of a wall
REPOINTING OF EXTERIOR WALL MORTAR HAS COME LOOSE
REPOINTING OF EXTERIOR WALL MORTAR HAS COME LOOSE
TUCKPOINTING TO BE DONE
TUCKPOINTING TO BE DONE AS MORTER IS COMING AWAY
Brick wall restoration
Have old brick walls that have been originally covered with render. Render...