Darryl requested 3 quotes from Brick Layers in Everton Hills
1. Remove Grout from existing sections of damaged wall in order to allow underpinning to be completed.
- 2. Replace damaged brick work once underpinning completed.
- 3. Install multiple Articulation Joints in 'repaired' wall.
Paul Conoley Bricklaying
11m rendered blockwall, footings are complete, wall height 400-800mm.
11 meters of wall with a couple of stirrups on top. The footings are...
Needs blocks put back into the wall
needs blocks put back into the wall
Blocklayer required to lay only 300, 200. 150. series masonry for retainin
Block layer required for early start for retaining wall
300 sreies , Fence &...
TO BUILD A FENCE OUT OF BRICKS
TO BUILD A BRICK RETAINING WALL. THE MATERIALS WILL NEED TO BE SUPPLIED.