Robert requested 0 quotes from Brick Layers in Chapel Hill
Job is primarily building a 3m retaining wall under a split level house. There is a fair bit of excavation required - mainly cutting back an earth wall and removing the dirt, before building the wall. Access is limited and although there is plenty of room to work once inside, the entrance is only about .8 metre. I think this means the digging will have to be jack hammer / shovel and wheelbarrow stuff. It's a pretty big job.
Retaining Wall
We require a besser brick retaining wall to be built before our builder will...
Retaining wall and block wall for garage
A block layer is required to build a retaining wall approx 30m x 1.2 m also...
Repair small section of damaged retaining wall
A small section (approx 75cm across, 30cm high) of rendered CMU retaining...
Install tall modular wall resembling block wall along each side of house
I need a tall modular wall resembling a block wall along each side of my...