Rachel requested 0 quotes from Brick Layers in Brighton
Hi we have some brick pavers which go to a shed. We have demolished the shed and there is now a rough edge of pavers which have been cemented in. Rather than pulling them up, we were wondering if someone could come with a paver/concrete cutter to run a neat cut along the edge (about 30cm in). We will do the removal ourselves but need someone with the equipment to do it. The length is about 8 metres.
Paving area 4m x 10m
Paving area 10m x 4m
New brick fence including footing.
build new brick fence for two new townhouses including footing. Fence will be...
Drain channel installation on pavers
We need a drain channel installed at the back of our house as water is...
Repair brickwork around window sills
Repair brickwork under window sill around the boundary of 2 bed unit