Wayne requested 3 quotes from Brick Layers in Mont Albert North
Small brick veneer extension, bricks to be rendered. Looking for a start on approx the 14th or 15th April. The footing is approx 600 bricks, this is required first and the top brickwork in approx 2 weeks after this.
Craig Laidlaw Bricklaying
Damian's Bricklaying
Subfloor Bricklaying
The existing section of cement sheeting subfloor wall was removed for...
Fix brick wall 1.6x1.8m
1950's sunroom needing to repalce stud wall which is sitting on top of brick...
Letterbox repaired
A car reversed into a letterbox displacing approximately 60 bricks. Bricks...
Bricklayer
laying through a stud wall - overhand for a boundary wall (off a slab- so its...